{"id":786950,"date":"2025-12-09T19:10:53","date_gmt":"2025-12-09T17:10:53","guid":{"rendered":""},"modified":"2025-12-09T19:10:53","modified_gmt":"2025-12-09T17:10:53","slug":"yak-pratsyuye-zastosunok-prozore-budivnytstvo","status":"publish","type":"post","link":"https:\/\/new.eba.com.ua\/en\/yak-pratsyuye-zastosunok-prozore-budivnytstvo\/","title":{"rendered":"How the Transparent Construction app works"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-698246 size-large\" src=\"https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-1024x576.png\" alt=\"\" width=\"1024\" height=\"576\" srcset=\"https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-1024x576.png 1024w, https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-300x169.png 300w, https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-768x432.png 768w, https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-650x366.png 650w, https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-570x320.png 570w, https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-270x152.png 270w, https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-800x450.png 800w, https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-125x70.png 125w, https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1-100x56.png 100w, https:\/\/new.eba.com.ua\/wp-content\/uploads\/2025\/12\/ProzoreBud-website-1280x720-1.png 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">For many years, the process of commissioning construction objects in Ukraine remained overly complicated, bureaucratic, and vulnerable to corruption. This significantly hindered project implementation and slowed down the development of the industry.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">To address this issue, the \u201cTransparent Construction\u201d mobile application was developed in collaboration with the State Inspection of Architecture and Urban Planning, the Ministry for Communities and Territories Development, and the Ministry of Digital Transformation of Ukraine. Its development was supported by the \u201cDigitalisation for Growth, Integrity and Transparency Project\u201d (UK DIGIT), partnered by East Europe Foundation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The new digital tool allows inspectors to accept objects with just a few clicks, maximally minimising the human factor and ensuring transparency at all stages.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The inspection algorithm is clearly automated and sequential:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Authorisation via Diia.Signature: The inspector undergoes secure identification, gaining access to a specific inspection.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Checklist completion: The inspector marks all mandatory points regarding the availability of executive documentation.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Photo documentation with geolocation: The inspector takes photos of the main systems and typical measures defined by the project solution. Each picture automatically records geolocation to confirm the location of the actual inspection.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Automatic upload: Images are automatically sent to the Unified State Electronic System in the Construction Sector (USESCS), and the report is stored in electronic format.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">After the inspection is completed, the report becomes available to the central office employees, who make the final decision on issuing or refusing the certificate.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Next year, the application will be implemented in the State Architectural and Construction Control bodies under local self-government bodies, which will unify approaches at all levels.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">We continue to form a unified digital standard for state control, where the human factor is minimised, and the quality of inspections improves due to full automation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The \u201cTransparent Construction\u201d mobile application was developed by the State Inspection of Architecture and Urban Planning of Ukraine in cooperation with the Ministry for Communities and Territories Development of Ukraine and the Ministry of Digital Transformation of Ukraine, with the support of the \u201cDigitalisation for Growth, Integrity and Transparency Project (UK DIGIT), implemented by Eurasia Foundation and funded by UK Dev. East Europe Foundation is the project partner.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Watch the <\/span><a href=\"https:\/\/youtu.be\/sqJVUAQQqww\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">video<\/span><\/a><span style=\"font-weight: 400;\"> to see how it works.<\/span><\/p>\n<p><iframe loading=\"lazy\" title=\"\u041f\u0440\u043e\u0437\u043e\u0440\u0435 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e - \u043c\u043e\u0431\u0456\u043b\u044c\u043d\u0438\u0439 \u0437\u0430\u0441\u0442\u043e\u0441\u0443\u043d\u043e\u043a\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/sqJVUAQQqww?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>For many years, the process of commissioning construction objects in Ukraine remained overly complicated, bureaucratic, and vulnerable to corruption. This significantly hindered project implementation and slowed down the development of the industry. To address this issue, the \u201cTransparent Construction\u201d mobile application was developed in collaboration with the State Inspection of Architecture and Urban Planning, the [&hellip;]<\/p>\n","protected":false},"author":4489,"featured_media":698246,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[15576,15575],"tags":[],"class_list":["post-786950","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-articles-en","category-news-and-articles-from-companies-en","company-22024"],"_links":{"self":[{"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/posts\/786950","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/users\/4489"}],"replies":[{"embeddable":true,"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/comments?post=786950"}],"version-history":[{"count":0,"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/posts\/786950\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/media\/698246"}],"wp:attachment":[{"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/media?parent=786950"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/categories?post=786950"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new.eba.com.ua\/en\/wp-json\/wp\/v2\/tags?post=786950"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}